Welcome to the
! Please enjoy our special offers for you
Dishwashers

Appliance
Delivery and Installation Services

Before Delivery

· The delivery team needs an unobstructed path, with 10-foot width clearance, between the unloading area and delivery location.

· The home has to be visible from the driveway and 30 yards from parking area.

· Clear parking and unloading site close to your home, sidewalk, and inside path.

· Access to use the elevator during the delivery appointment. If you don’t have an elevator: 3 flights, or less, of stairs.

· Ensure all new construction work, such as: plumbing, electrical, flooring, etc, is completed before your delivery appointment.

· Double check dimensions.

· Measure the height, width, and depth of the empty space the appliance is going into.

Home Installation Service

(Purchased Separately)

· Delivery of unit to Consumers’ home for installation (3 flights max).

· Performing installation.

· Replacing all existing connectors with new parts Plugging-in to confirm that product is fully functional.

· Leveling of product(s).

· Removal of the appliance carton and dunnage.

· The installation service must be purchased at checkout.

· Local regulations require certain appliances to be installed by a licensed professional. As a result, delivery and installation may occur on different dates.

· No conversion of from gas to propane.

Standard Deliveries

(No Installation)

· A responsible adult, 18 years or older, must be present at delivery.

· Confirm the unit matches your paperwork -Model #, Color, Style before you sign.

· Delivery of unit to Consumers’ home and room of choice (3 flights of stairs max).

· Unboxing and Debris removal (if requested).

· Removal of the appliance carton and dunnage.

· Inspection of unit and confirmation of model.

· Local regulations require certain appliances to be installed by a licensed professional. As a result, delivery and installation may occur on different dates.

 

Haul-away Service

 

 (Purchased separately)

· Removal of 1 appliance when service is purchased at checkout (if within household it can be a room of choice)

· The appliance must be emptied of any personal belongings.

· For built-in appliances, the appliance must be uninstalled.

· Delivery team will not be able to haul away sub-zero and built-in refrigerators.

· Door removal for refrigerators is not included

Refrigerator & Freezers
· For refrigerators with an icemaker or an ice and water dispenser: a working shut-off valve connected to a 1/4” stainless steel water line must be located within 6 feet of the appliance and be on the same floor of the home
· The shut-off valve must be free of rust and corrosion
· Refrigerators are big, make sure you double check the dimensions
Refrigerator Delivery Checklist

Delivery Only

Before Delivery:

· Check the dimensions: Measure the height, width and depth of the empty space your appliance is going into. Make sure to account for your existing countertops, cabinets and drain pans. Any adjacent walls or cabinets will require 3 1/2” of extra space in the width for the doors to fully open. (Please reference Refrigerator Measuring tips video)

· A 110V grounded 3-prong electrical outlet must be within reach of the power cord.

· For refrigerators with an icemaker or an ice and water dispenser: a working shut-off valve connected to a 1/4” stainless steel water line must be located within 6 feet of the appliance and be on the same floor of the home. Note: the shut-off valve must be free of rust and corrosion.

· Accessories required (this is only included with the ‘Delivery + Installation’ service):
      o UL listed 6’ water line.

Delivery + Installation

Before Delivery:

· Check the dimensions: Measure the height, width and depth of the empty space your appliance is going into. Make sure to account for your existing countertops and cabinets. Any adjacent walls or cabinets will require 3 1/2” of extra space in the width for the doors to fully open. (Please reference Refrigerator Measuring tips video)

· A 110V grounded 3-prong electrical outlet must be within reach of the power cord.

· For refrigerators with an icemaker or an ice and water dispenser: a working shut-off valve connected to a 1/4” stainless steel water line must be located within 6 feet of the appliance and be on the same floor of the home. Note: the shut-off valve must be free of rust and corrosion. The delivery team cannot work with exposed wires and are unable to connect directly to an existing copper water line.

· Water line must be shut off.

· Accessories required and included:
     o UL listed 6’ water line.

Gas Range

· There must be a natural gas shut-off valve directly behind the range location
· These are required and only included with installation: 4’ x 5/8” OD coated gas connector, 1/2” MIP x 1/2” MIP, 3/4” MIP fitting, thread sealant, leak test solution
Gas Range Delivery Checklist

Delivery Only

Before Delivery:

Check the dimensions: Measure the height, width and depth of the empty space your appliance is going into. Make sure to account for your existing countertops and cabinets.. (Please reference Gas Range Measuring tips video)

· Ensure there is a natural gas shut-off valve located directly behind the range location. Gas valves must be made of metal, in good working condition, and be free of any rust. The delivery team will not be able to connect the range to plastic or rusty connectors.

· The anti-tip bracket will be attached to the range during installation. Please be aware that installation of the anti-tip bracket will require small holes to be drilled into the floor or the wall behind the range. Drilling into the floor includes tile, wood, or other hard surfaces. If you choose to not have the anti-tip bracket installed the Delivery Team will not be able to complete the install and the appliance will be left in the box.

· A 110V grounded 3-prong electrical outlet must be within reach of the power cord.

· Accessories required (this is only included with the ‘Delivery + Installation’ service):
     o 4’ x 5/8” OD coated gas connector, 1/2” MIP x 1/2” MIP, 3/4” MIP fitting, thread sealant, leak test solution

Delivery + Installation

Before Delivery:

Check the dimensions: Measure the height, width and depth of the empty space your appliance is going into. Make sure to account for your existing countertops and cabinets. (Please reference Gas Range Measuring tips video)

· Ensure there is a natural gas shut-off valve located directly behind the range location. Gas valves must be made of metal, in good working condition, and be free of any rust. The delivery team will not be able to connect the range to plastic or rusty connectors.

· The anti-tip bracket will be attached to the range during installation. Please be aware that installation of the anti-tip bracket will require small holes to be drilled into the floor or the wall behind the range. Drilling into the floor includes tile, wood, or other hard surfaces. If you choose to not have the anti-tip bracket installed the Delivery Team will not be able to complete the install and the appliance will be left in the box.

· A 110V grounded 3-prong electrical outlet must be within reach of the power cord. • No conversion/transfer from gas range to propane · Accessories required and included: 4’ x 5/8” OD coated gas connector, 1/2” MIP x 1/2” MIP, 3/4” MIP fitting, thread sealant, leak test solution

Electric Range

· A 3 or 4 prong plug must be available and ready for the unit, otherwise an electrician will need to install one before delivery
· Ensure that a dedicated, properly grounded 220/240-volt branch circuit, protected by a 40-amp circuit breaker, is ready
· Power cables are only included with installation
Electric Range Delivery Checklist

Delivery Only

Before Delivery:

· Check the dimensions: Measure the height, width and depth of the empty space your appliance is going into. Make sure to account for your existing countertops and cabinets. (Please reference Electric Range Measuring tips video)

· The anti-tip bracket will be attached to the range during installation. Please be aware that installation of the anti-tip bracket will require small holes to be drilled into the floor or the wall behind the range. Drilling into the floor includes tile, wood, or other hard surfaces. If you choose to not have the anti-tip bracket installed the Delivery Team will not be able to complete the install and the appliance will be left in the box.

· A 3- or 4-prong plug ready. If the current range does not have a cord with a 3- or 4-prong plug, an electrician will need to install the correct outlet before delivery. · Power cables are only included with installation

o   Accessories required (this is only included with the ‘Delivery + Installation’ service):

o   UL listed 4’ 50 amp 3-wire range cord or

o   UL listed 4’ 50 amp 4-wire range cord

Delivery + Installation

Before Delivery:

· Check the dimensions: Measure the height, width and depth of the empty space your appliance is going into. Make sure to account for your existing countertops and cabinets. (Please reference Electric Range Measuring tips video)

· The anti-tip bracket will be attached to the range during installation. Please be aware that installation of the anti-tip bracket will require small holes to be drilled into the floor or the wall behind the range. Drilling into the floor includes tile, wood, or other hard surfaces. If you choose to not have the anti-tip bracket installed the Delivery Team will not be able to complete the install and the appliance will be left in the box.

· A 3- or 4-prong plug ready.If the current range does not have a cord with a 3- or 4-prong plug, an electrician will need to install the correct outlet before delivery.

· We do not hard-wire free standing electric ranges and only install by attaching the recommend 4 or 3 wire range cord as per the manufacturer

· Ensure that you have a dedicated, properly grounded 220/240-volt branch circuit, protected by a 40-amp circuit breaker.

· Accessories required and included:

· UL listed 4’ 50 amp 3-wire range cord or

· UL listed 4’ 50 amp 4-wire range cord  

Microwaves

· Exhaust ducts must be located in the cabinet, above the installation site, if planning to exhaust to the outside
· Unit must be installed at least 24 inches above the range, or as recommended from the local code requirements
Microwaves Delivery Checklist

Delivery Only

Before Delivery:

· Check the dimensions: Measure the height, width and depth of the empty space your appliance is going into. Make sure to account for your existing countertops and cabinets. (Please reference Microwave Measuring tips video)

· If you are planning to exhaust the microwave to the outside, there must be an existing exhaust duct located in the cabinet above the installation location. The exhaust duct size must match the vent size of the new microwave.

· Microwave must be installed at least 24 inches above a range or as recommended from the Manufacturer/Local Code requirements.

Make sure the location where the unit is going has a grounded 3-prong 110V electrical outlet. Otherwise, an electrician will need to install the correct outlet before delivery.

Delivery + Installation

Before Delivery:

· Check the dimensions: Measure the height, width and depth of the empty space your appliance is going into. Make sure to account for your existing countertops and cabinets. (Please reference Microwave Measuring tips video)

· If you are planning to exhaust the microwave to the outside, there must be an existing exhaust duct located in the cabinet above the installation location. The exhaust duct size must match the vent size of the new microwave.

· Microwave must be installed at least 24 inches above a range or as recommended from the Manufacturer/Local Code requirements.

· Teams will not drill into tile, granite, marble, manufactured stone, slate or mirrors. Teams will not drill into tile, granite, marble, manufactured stone, slate or mirrors.

· Make sure the location where the unit is going has a grounded 3-prong 110V electrical outlet. Otherwise, an electrician will need to install the correct outlet before delivery.

Dishwasher

· Depending on the building codes of your area, a GFCI or Arc Fault GFCI outlet may need to be installed by an electrician, prior to delivery and installation
· A 110/120-volt, 3-prong, grounded electrical outlet protected by a dedicated 15 or 20-amp circuit breaker must be located within 5 feet of the installation location
Dishwasher Delivery & Installation Checklist

Delivery Only

Before Delivery:

· An accessible shut-off valve, located under the sink or behind the dishwasher location, must be available. The delivery team cannot install a dishwasher if the shut-off valve is located in a crawl space, a basement, or is inaccessible. Note: the shut-off valve must be free of rust and corrosion.

· Depending on the building codes in your area, a GFCI or Arc Fault GFCI outlet* may need to be installed by an electrician, prior to delivery.

· Ensure that there is a 110/120-volt, 3-prong, grounded electrical outlet protected by a dedicated 15 or 20-amp circuit breaker located within 5 feet of the installation location.

· Accessories required (this is only included with the ‘Delivery + Installation’ service):
    o Dishwasher Kit (6’ stainless steel dishwasher water line, 6’ straight power cord, 3/4” elbow, 3/8” elbow, plastic Romex connector, worm gear clamp (2), wire nuts (3), Teflon tape and screws (2)

Delivery + Installation

Before Delivery:

· Check the dimensions: Measure the height, width and depth of the empty space your appliance is going into. Make sure to account for your existing countertops and cabinets. (Please reference Dishwasher Measuring tips video)

· Depending on the building codes in your area, a GFCI or Arc Fault GFCI outlet* may need to be installed by an electrician, prior to delivery.

· To ensure proper drainage, dishwashers must be installed no more than 10 feet from the sink/primary drain. (Please reference Dishwasher Measuring tips video)
 
· The dishwasher cannot be installed if drain line is not visible between the unit and the sink (e.g. lazy Susan in between).

· An accessible shut-off valve, located under the sink or behind the dishwasher location, must be available. The delivery team cannot install a dishwasher if the shut-off valve is located in a crawl space, a basement, or is inaccessible. Note: the shut-off valve must be free of rust and corrosion.

· Ensure that there is a 110/120-volt, 3-prong, grounded electrical outlet protected by a dedicated 15 or 20-amp circuit breaker located within 5 feet of the installation location.

· Hardwire Dishwashers:

· The Dishwasher Installation Kit comes with a Plug that wires directly to the Dishwasher. If you do not have an outlet near the dishwasher, the Team may not directly connect the residential electrical wire to the dishwasher.

· Require the DW to plug into a GFCI or ARC-Fault GFCI outlet only.

· The residential electrical line needs to have an on/off switch near the dishwasher.

· Accessories required and included:
· Dishwasher Kit (6’ stainless steel dishwasher water line, 6’ straight power cord, 3/4” elbow, 3/8” elbow, plastic Romex connector, worm gear clamp (2), wire nuts (3), Teflon tape and screws (2)

Washer

· Washers and dryers are able to be stacked but only when purchased as a bundle and delivered together
· The installation team will not install a washer or dryer on an existing (old) pedestal nor on a generic, non-Samsung branded, pedestal
· The washer drain stand pipe needs to be 34-60 inches above the floor to ensure proper drainage
Washer Delivery Checklist

Delivery Only

Before Delivery:

· Check the dimensions: Measure the height, width and depth of the empty space your appliance is going into. Make sure to account for your existing countertops and cabinets. (Please reference Washer Measuring tips video)

· The hot and cold water shut-off valves need to be easily identifiable and accessible. All connections must be in good working condition. Please ensure that the water shut-off valves meet these requirements before delivery. Note: the shut-off valves must be free of rust and corrosion.

· Washers and dryers are able to be stacked but only when purchased as a bundle and delivered together.

· Pedestals must be purchased with your order and arrive with your washer on your delivery. Pedestals are a laundry accessory used to raise the height of washers and dryers. Pedestals cannot be installed unless the pedestal is purchased in a laundry package. NOTE: The installation team will not install a washer or dryer on an existing (old) pedestal nor on a generic, non-Samsung branded, pedestal.

· Pipe adapter needs to be prepared (if applicable). The washer drain stand pipe needs to be 34-60 inches above the floor to ensure proper drainage. The pipe must have a 2” opening or an adapter will be required. An adapter can be purchased at a local hardware store. If needed, please purchase before delivery.

· Ensure there is a 110/120-volt, 3-prong, grounded electrical outlet protected by a dedicated 15 or 20-amp circuit breaker.

· Accessories required (this is only included with the ‘Delivery + Installation’ service):

     o   UL listed 6’ water supply hoses.

Delivery + Installation

Before Delivery:

· Check the dimensions: Measure the height, width and depth of the empty space your appliance is going into. Make sure to account for your existing countertops and cabinets. (Please reference Washer Measuring tips video)

· The hot and cold water shut-off valves need to be easily identifiable and accessible. All connections must be in good working condition. Please ensure that the water shut-off valves meet these requirements before delivery. Note: the shut-off valves must be free of rust and corrosion.

· Washers and dryers are able to be stacked but only when purchased as a bundle and delivered together.

· Pedestals must be purchased with your order and arrive with your washer on your delivery. Pedestals are a laundry accessory used to raise the height of washers and dryers. Pedestals cannot be installed unless the pedestal is purchased in a laundry package. NOTE: The installation team will not install a washer or dryer on an existing (old) pedestal nor on a generic, non-Samsung branded, pedestal.

· Pipe adapter needs to be prepared (if applicable). The washer drain stand pipe needs to be 34-60 inches above the floor to ensure proper drainage. The pipe must have a 2” opening or an adapter will be required. An adapter can be purchased at a local hardware store. If needed, please purchase before delivery.

· Ensure there is a 110/120-volt, 3-prong, grounded electrical outlet protected by a dedicated 15 or 20-amp circuit breaker.

· Accessories required and included:

· UL listed 6’ water supply hoses.

Electric Dryer

· You will need the following accessories, which are only included with Installation:
o UL listed 4’ 50 amp 3-wire range cord  
o UL listed 4’ 50 amp 4-wire range cord
o UL listed 8’ dryer vent with clamps (2)
o Steam dryer kit (5’ fill hose, 1’ fill hose, “Y” connector) 
*Select models only
Electric Dryer Delivery Checklist

Delivery Only

Before Delivery:
· A metal vent pipe is required for proper dryer ventilation. Be sure to inspect your existing vent and also clean or remove anything that could block or clog the vent, such as built up lint.

· The delivery team will not be able to connect the range to plastic or rusty connectors.

· Must have a dedicated properly grounded 220/240-volt brand circuit, protected by a 30-amp circuit breaker or a time-delay fuse.

· Accessories required (this is only included with the ‘Delivery + Installation’ service):
o   UL listed 4’ 50 amp 3-wire range cord  or
o   UL listed 4’ 50 amp 4-wire range cord
o   UL listed 8’ dryer vent with clamps (2)
o   Steam dryer kit (5’ fill hose, 1’ fill hose, “Y” connector) *Select models only

Delivery + Installation

Before Delivery:

· Washers and dryers are able to be stacked but only when purchased as a bundle and delivered together.

· A metal vent pipe is required for proper dryer ventilation. Be sure to inspect your existing vent and also clean or remove anything that could block or clog the vent, such as built up lint.

· The delivery team will not be able to connect the range to plastic or rusty connectors.

· Pedestals must be purchased with your order and arrive with your dryer on your delivery. Pedestals are a laundry accessory used to raise the height of washers and dryers. Pedestals cannot be installed unless the pedestal is purchased in a laundry package. NOTE: The installation team will not install a washer or dryer on an existing (old) pedestal nor on a generic, non-Samsung branded, pedestal.

· Ensure there is a natural gas shut-off valve located directly behind the dryer location. Gas valves must be made of metal, in good working condition, and be free of any rust. The delivery team will not be able to connect the range to plastic or rusty connectors.

· Must have a dedicated properly grounded 220/240-volt brand circuit, protected by a 30-amp circuit breaker or a time-delay fuse.

· Dryers will need to be installed with the vent kit located in the back of the unit and side vent kits will not be completed.

· Accessories required and included:

o   UL listed 4’ 50 amp 3-wire range cord  or
o   UL listed 4’ 50 amp 4-wire range cord
o   UL listed 8’ dryer vent with clamps (2)
o   Steam dryer kit (5’ fill hose, 1’ fill hose, “Y” connector) *Select models only  

Gas Dryer

· You will need the following accessories, which are only included with installation:
o 4’ x 5/8” OD coated gas connector, 1/2” MIP x  1/2” MIP, 3/4” MIP fitting, thread sealant, leak test solution
o UL listed 8’ dryer vent with clamps (2)
o Steam dryer kit (5’ stainless steel fill hose, 1’ stainless steel fill hose, “Y” connector)
*Select models only
Gas Dryer Delivery & Installation Checklist

Delivery Only

Before Delivery:

· Ensure you have a 110V grounded 3-prong electrical outlet within reach of the power cord.

· A metal vent pipe is required for proper dryer ventilation. Be sure to inspect your existing vent and also clean or remove anything that could block or clog the vent, such as built up lint.

· Washers and dryers are able to be stacked but only when purchased as a bundle and delivered together.

· Pedestals must be purchased with your order and arrive with your dryer on your delivery. Pedestals are a laundry accessory used to raise the height of washers and dryers. Pedestals cannot be installed unless the pedestal is purchased in a laundry package. NOTE: The installation team will not install a washer or dryer on an existing (old) pedestal nor on a generic, non-Samsung branded, pedestal.

· The unit must be within 4ft of the gas line.

· Accessories required (this is only included with the ‘Delivery + Installation’ service): o   4’ x 5/8” OD coated gas connector, 1/2” MIP x  1/2” MIP, 3/4” MIP fitting, thread sealant, leak test solution

o   UL listed 8’ dryer vent with clamps (2)

o   Steam dryer kit (5’ stainless steel fill hose, 1’ stainless steel fill hose, “Y” connector) *Select models only

Delivery + Installation

Before Delivery:

· Ensure you have a 110V grounded 3-prong electrical outlet within reach of the power cord.

· A metal vent pipe is required for proper dryer ventilation. Be sure to inspect your existing vent and also clean or remove anything that could block or clog the vent, such as built up lint.

· Washers and dryers are able to be stacked but only when purchased as a bundle and delivered together.

· Pedestals must be purchased with your order and arrive with your dryer on your delivery. Pedestals are a laundry accessory used to raise the height of washers and dryers. Pedestals cannot be installed unless the pedestal is purchased in a laundry package. NOTE: The installation team will not install a washer or dryer on an existing (old) pedestal nor on a generic, non-Samsung branded, pedestal.

· Ensure there is a natural gas shut-off valve located directly behind the dryer location. Gas valves must be made of metal, in good working condition, and be free of any rust. The delivery team will not be able to connect the range to plastic or rusty connectors.

· The unit must be within 4ft of the gas line.

· Accessories required and included: · 4’ x 5/8” OD coated gas connector, 1/2” MIP x  1/2” MIP, 3/4” MIP fitting, thread sealant, leak test solution

· UL listed 8’ dryer vent with clamps (2)

· Steam dryer kit (5’ stainless steel fill hose, 1’ stainless steel fill hose, “Y” connector) *Select models only

· Dryers will need to be installed with the vent kit located in the back of the unit and side vent kits will not be completed.

Fast, easy checkout with Shop Samsung App
Easy sign-in, Samsung Pay, notifications, and more!
Or continue shopping on Samsung.com
×
The Shop Samsung app
Free standard shipping, exclusive offers and financing options.
GET
×
The Shop Samsung app
Free standard shipping, exclusive offers and financing options.
GET
×

You Are About To Be Redirected To Investor Relations Information for U.S.

Thank you for visiting Samsung U.S. Investor Relations. You will be redirected via a new browser window to the Samsung Global website for U.S. investor relations information.
CANCEL
CONTINUE
×

Redirect Notification

As of Nov. 1, 2017, the Samsung Electronics Co., Ltd. printer business and its related affiliates were transferred to HP Inc.

For more information, please visit HP's website: http://www.hp.com/go/samsung


Select CONTINUE to visit HP's website.

CANCEL
CONTINUE